SWPN Projects

EFFLUENT AND WASTE WATER MANAGEMENT WORKING GROUP:

Focused on coordinating private and public sector players to optimise the utilisation of treated effluent and waste water.

PROJECT: Mine Water Project – Phase 2

Catchment Intervention Framework has been approved. Options analysis up to pre-feasibility phase for priority collaborative interventions completed.

Coordinating body structure model analysis including time frames for development and implementation has been completed.

 

The working group is developing a business plan for the Coordinating Body for phase 2.

AGRICULTURAL SUPPLY CHAIN WORKING  GROUP:

Focus on developing solutions to water use efficiency in irrigation and ways of unlocking finance for irrigation scheme upgrades and transformation.

PROJECT: Vaalharts Irrigation Scheme Upgrade

Presidential Infrastructure Coordinating Commission (PICC) formally charged with developing a business case for upgrading of the scheme.

National Agricultural Marketing Council (NAMC) appointed by PICC to lead Vaalharts project.

SWPN supporting NAMC to develop business case and terms of reference.

 ____________________________________

PROJECT: Water Administration System

Project Steering Committees have been established for all four irrigation schemes.

Measuring gauges have been put in place and progress reports have been received with an analysis of water use and loss .

_________________________________________ 

WATER USE EFFICIENCY AND LEAKAGE REDUCTION WORKING GROUP:

Focused on developing solutions for reducing water losses in municipal, industrial and agriculture water systems.

PROJECT: No Drop Programme Phase 2

Adopted into SA regulatory framework.

Municipalities have been assessed using three most essential Key Performance Areas (KPAs) of the ‘No Drop’ scorecard.

All eight metropolitan municipalities have been audited against the full ‘No Drop’ scorecard with seven KPAs.

Data received from municipal assessment to be included in the Blue Drop Report 2014 under the ‘No Drop’ section.

____________________________________

PROJECT: Model Performance Based Contract

Model contract has been completed.

SWPN, GIZ and SALGA jointly launched the Performance Based Contract in March 2015.

Founding members

Anglo American Logo - New           

Platinum members